Run: not startedi
iiiii
Ready0%
Model
Build the pavement structure, define the loads, and choose where the solver should report results.
Pavement Structure
Thickness is entered in mm. Keep at least one finite layer above the fixed subgrade row.
Ready3 finite layers
| Layer # | Thickness h (mm) | E (MPa) | ν | Interface below | Ks (MPa/m) | Actions |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | Subgrade | n/a | Fixed subgrade |